Field Results

Field Results: Melstone, MT

  • 15 Tellerus static mixers have been installed by two operators 
  • 36-42 month average pump change interval prior to installation of static mixers 
  • 5 Static Mixers installed in 2008-2009 (13-14 years ago)  
  • 3 Static Mixers installed in 2012-2013 (9-10 years ago) 
  • Only one well has required a workover (after 6 years of runtime) since the static mixers were installed 
  • Chemical (corrosion inhibitor, scale inhibitor, biocide combo product) rates reduced from 2 ga/1000 bbl to 1 ga/1000 bbl (50% reduction) 
field results 1

Field Results: Williston Basin

  • Large independent operator in Williston Basin  
  • Using a Tellerus static mixer to improve surface flow 
  • 80% reduction in emulsion breaker 
  • Reduced flowline pressures by 35% 
  • Increased production by 5-6 bbl/d 
  • ROI of just 90 days! 
fields results 2

Field Results: Big Horn Basin, Wyoming

  • Major oil company in the Big Horn Basin  
  • 400% reduction in oil carryover to meet Wyoming surface discharge permit limits