Field Results
Field Results: Melstone, MT
- 15 Tellerus static mixers have been installed by two operators
- 36-42 month average pump change interval prior to installation of static mixers
- 5 Static Mixers installed in 2008-2009 (13-14 years ago)
- 3 Static Mixers installed in 2012-2013 (9-10 years ago)
- Only one well has required a workover (after 6 years of runtime) since the static mixers were installed
- Chemical (corrosion inhibitor, scale inhibitor, biocide combo product) rates reduced from 2 ga/1000 bbl to 1 ga/1000 bbl (50% reduction)
Field Results: Williston Basin
- Large independent operator in Williston Basin
- Using a Tellerus static mixer to improve surface flow
- 80% reduction in emulsion breaker
- Reduced flowline pressures by 35%
- Increased production by 5-6 bbl/d
- ROI of just 90 days!
Field Results: Big Horn Basin, Wyoming
- Major oil company in the Big Horn Basin
- 400% reduction in oil carryover to meet Wyoming surface discharge permit limits